Where to Go
Updated May 16, 2013 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
124 Kansas City, MO |
Scale $34.83 |
Lacygne scrubber expected to hire again in June. Second phase of Ford project scheduled for July. GM upgrades currently underway, with the new paint building expected to be going by August/Sept.. Another shutdown scheduled for summer, Thanksgiving & Christmas consisting of 3 to 4 weeks. Should maintain a core group of 20-30 JW's for the duration of the upgrades that should last until 2015.Books are here. |
1 St. Louis, MO |
1st shift - $31.75 |
Work is slow throughout the area.Book 1 = 765 |
6 San Fransisco, CA |
Scale = $54.87 |
Work is very good with most local hands working. Projects include tenant finish remodels, condominiums, office buildings, tower high rise work, a couple of hospitals & trans bay terminal. Bottom of book 2 probably taking a few months to get out. CA State license required on all projects and 3 strike rule in effect.Book 1 = 18 |
8 Toledo, OH |
Scale $35.09 |
Work is very slow throughout the area. May have refinery & power plant work next year.Book 1 = 414 |
11 Los Angeles, CA |
Scale $37.95MUST HAVE EMBOSSED ORIGINAL
TRAVEL LETTER FROM YOUR HOME LOCAL TO SIGN BOOKS - WILL NOT EXCEPT FAXES. |
1st phase of solar job winding down. Several more solar projects expected to man up in the near future. Waving State license on solar calls. All others require State license. 2nd phase projected to take on another 100. Most calls going into Book 2.Book 1 = 660 |
12 Pueblo, CO |
Scale $27.00 |
Work is slow at the present time.Book 1 = 52 |
13 Burlington, IA(319) 752-0452 |
Scale = $26.35 / $26.40Must have a State license. |
Local has a lot of work. Prison project still ongoing along with work at generating station. Scrubber expected to start manning up over the next several weeks. Fertilizer plant scheduled for the Fall.Book 1 = 1 |
16 Evansville, IN |
Scale = $33.43 |
Calls are slow throughout the area. Many of the expected projects have been put on hold or cancelled completely. Coal gasification plant being resubmitted for approval.Book 1 = 255 |
20 Dallas/Fort Worth, TX |
Scale $25.20 |
Work has slowed. Hospital job is laying off, but more calls are expected in the Spring. Future projects include State Farm building, data center & research development center.Book 1 = 111 |
22 Omaha, NE |
Scale = $31.00 |
Calls continue to come in for Google data center with more calls expected for both Miller & Sachs Electric. MUST have Iowa State license or unclassified license & OSHA-10 in hand to take referral. All other local calls require a Nebraska State license.Book 1 = 32 |
32 Lima, OH
|
Scale = $27.08 |
Calls have slowed in the area, but expected to pick up again soon. Several jobs for Honda upcoming including work at both engine & transmission plants as well as continuing work at refinery. Chemical plant expansion scheduled for next year.Book 1 = 37 |
41 Buffalo, NY |
Scale = $31.39 |
Work in area has slowed.Book 1 = 66 |
43 Syracuse, NY |
Scale=$32.05 |
work looks good for the summer. Got into Book 2 for nuke outage, but not expected to happen again until late May. Projects include cancer wing expansion, aluminum plant addition, hospital expansion, and casino addition.Book 1=139 |
48 Portland, OR |
Scale = $37.05Need State licese. |
Calls going into Book 2. Intel plant estimated to hire 700 wiremen on project. Must have Oregon State license. For licensing info go to oregonlicensebcd.orgBook 1 = 320 |
60 San Antonio, TX |
Scale = $25.60 |
Work is slowing down. School project is starting to layoff.Book 1 = 33 |
64 Youngstown, OH |
Scale = $30.10 |
Steel mill starting to wind down. Future jobs expected this summer include a casino, a hospital project adn continuing work at the steel mill.Book 1 = 20 |
95 Joplin, MO |
Scale = $24.55 |
Calls going into Book 2. Work looks good going into June. Projects include hospital, scrubber & school work.Book 1 = 4 |
112 Kennewick, WA/OR |
Scale = $36.55 |
Work looks good for the spring/summer. May get a few into Book 2. Data center starting to hire. Nuke & powerhouse outages scheduled for May. Referral is a daybook & Oregon State license is required.Book 1 = 59 |
129 Lorain, OH |
Scale $31.00 |
Work very slow throughout the area.Book 1 = 55 |
139 Elmira, NY |
Scale $32.25 |
Have work for Book 2 this summer, but mostly 40 hours. Projects include factory job, hospital, and school work.Book 1 = 12 |
158 Green Bay, WI |
Scale $28.10 |
Nuke outage in March expected to be manned by local hands.Book 1 = 40 |
159 Madison, WI |
Scale = $32.943 strike rule in effect. |
Calls going into Book 2. A lot of work in the surrounding area with more coming. Projects include Epic Health Care Software, powerhouse scrubber, hospital, hotel & upgrades to Oscar Meyer plant. 400 travelers working currently with only half of project manpower hire to date.Book 1 = 12 |
175 Chattanooga, TN |
Scale = $28.18 |
Calls for Nuke Plant outages. Nuke calls have slowed.Book 1 = 168 |
226 Topeka, KS |
Scale = $28.00 |
A few calls going into Book 2. Most calls are 40 hours.Book 1 = 30 |
231 Sioux City, IA |
Scale = $29.04 |
Book one is clear. Powerhouse has 70-80 wireman at the present time.Book 1 = clear |
236 Albany, NY |
Scale $32.55 |
Work is slow throughout the area. Hospital project manned up. Chip plant has several jobs coming up including a research development building. University & school work scheduled to start in Spring. May get into Book 2 by the end of summer.Book 1 = 290 |
238 Ashville, NC |
Scale = $21.85 |
Facebook project is ongoing. Not expected to get into Book 2. Summer work looks slow.Book 1 = 5 |
242 Duluth, MN |
Scale = $31.27 |
Work has been plentiful for the last couple of months. Local hands keeping busy with some calls getting into book 2. Paper mill shutdown should be complete by the end of April. Refinery project is ongoing, but mostly manned up. Have some summer work coming up, but not expected to get into book 2. Fifteen story office building has been pushed back to next year.Book 1 = 60 |
257 Jefferson City, MO |
Scale = $30.42 |
Callaway outage manned up. Most local work going into the summer expected to stay in Book 1Book 1 = 12 |
265 Lincoln, NE
|
Scale = $25.77 |
Calls going into book 2. Arena project currently working 5-10's Other local work is mostly 40 hours.Book 1 = 2 |
270 Oak Ridge, TN |
Scale $24.07 |
Work slow.Book 1 = 107 |
271 Wichita, KS |
Scale $28.23 |
Paynecrest Electric starting to hire for ethanol plant in Hugoton. Expected to hire up to 60 over the next several weeks. Other projects include airport terminal, HLS building & various remodels downtown. Ding system is now in effect.Book 1 = 76 |
278 Corpus Christi, TX |
Scale $22.70Job line (361) 855-7775 |
Locals working, but calls have slowed for Book 2. Expected to pick up again in a couple months with work at Flint Hills, Cidco & Valero refineries.Book 1 = 11 |
288 Waterloo, IA |
Scale = $25.89 |
Work is slowing down in the area with more layoffs expected.Book 1 = 20 |
305 Fort Wayne, IN |
Scale = $29.98 |
Work is slow. GM shutdown scheduled for the last week of June.Book 1 = 102 |
322 Casper, WY |
Scale = $25.31 - $26.75Jobline (800) 953-1170 |
Calls going into Book 2. Oil & gas projects throughout the area. Most calls pay per diem. Calls require a Wyoming State license or work permit obtained through the State.Book 1 = 15 |
325 Bingham, NY |
Scale $29.65 |
Calls have slowed. Layoffs expected.Book 1 = 10 |
332 San Jose, CA |
Scale $48.57 |
Layoffs have caused book 1 numbers to increase & local hands taking most calls in the area. Look to around late June to see opportunities for book 2. Stadium job is ongoing with a lot of upcoming projects including Nvidia, Samsung, Likin, 2 hospitals & Google complex. Apple project still a year out.Book 1 = 130 |
347 Des Moines, IA |
Scale = $31.58 |
Continuing work at Fort Dodge & Facebook project expected to start manning up in June. Summer looks busy. State license required on most projects however a B license can be obtained through the City.Book 1 = 158 |
354 Salt Lake City, UT |
Scale = $27.84 |
Work has slowed down considerable in the area. Data center winding down & more layoffs are expected. Refinery project mostly working local hands at the present time. All calls in the future will require a state license or a reciprocal license from another state.Book 1 = 119 |
369 Louisville, KY |
Scale = $29.27 |
Work is slow in the area but expected to pick up this summer. Projects include 2 schools, a hospital & Ford plant in September. Work for book 2 between July- September.Book 1 = 200 |
379 Charlotte, NC |
Scale $22.30 |
Work coming - AT&T data center expected to hire 100 or more.Book 1 = 42 |
415 Cheyenne, WY |
Scale $25.22 |
Calls going into book 2. Powerhouse still hiring for shutdown work. These calls require a Wyoming State license & OSHA 10 within the last 3 years. Microsoft data center expecting more calls soon as well as hospital remodel & addition project. Those jobs will require a State license.Book 1 = 15 |
426 Sioux Falls, SD |
Scale = |
New bag house project has started to break ground on the powerhouse. Will hire a few locals this summer but not expected to start manning up until sometime in the Fall. Project has a 2015 completion date & will also pay $50 a day per diem.Book 1 = 138 |
428 Bakersfield, CA |
Scale $33.15 |
Work slowing starting to pick back up. Calls should be back to normal in a month or so with 4 or 5 smaller solar projects starting. Upcoming work includes Hospital project, Hydrogen plant in June/July & 650 mega-watt solar project in July/August. Most calls require California state license.Book 1 = 23 |
429 Nashville, TN |
Scale = $21.85
|
Calls have slowed. Layoffs have led to Book 1 rise in numbers. Have some car plant work.Book 1 = 184 |
436 El Dorado, AR |
Scale $23.26 |
Job went non-union. No work in foreseeable future.Book 1 = 9 |
440 Riverside, CA |
Scale $35.15 |
Desert Center solar project nearly topped out - about 375 electricians currently onsite - rumored to be hiring more at some point. Desert Center solar job NOT requiring a state license and pay an additional $8/hour sub. All other jobs DO require State license.Book 1 = 50 |
449 Pocatello, ID |
Scale $26.80 |
Work is very slow. Waiting on future plutonium enrichment facility to start sometime next year.Book 1 = 160 |
477 San Bernardino, CA |
Scale $35.35 |
Solar project manpower has peaked. MSHA certification required on mine project.Book 1 = 128 |
479 Beaumont, TX |
Scale = $26.00 |
Work remains steady in the area. Chevron expected to hire more & Keystone Pipeline project is moving forward. Motiva shutdown is over, but may have more work in the near future. Book 1 = 13 |
480 Jackson, MS |
Scale = $23.85 |
GGNS is manned up - Local work is slow.Book 1 = 250 |
508 Savannah, GA |
Scale $22.52 |
Nuke plant laying off. In town work being manned by locals. Book 2 is slow.Book 1 = 200 |
518 Globe, AZ |
Scale $25.25 |
Work is slow overall. A few line calls coming in - Must have MSHA & current First Aid / CPR to take line calls.Book 1 = 15 |
520 Austin, TX |
Scale $25.85 |
Work is booming in the area. Plenty of work for travelers with OT on a few projects. A few of these calls are yearlong projects. Work includes Apple job, Flextronics, University work, & water treatment plant. Standing calls at the present time.Book 1 = 70 |
527 Galveston, TX |
Scale $25.45 |
Industrial & commercial projects coming include hospital & Coast Guard station. TWIC card, drug test and hair follicle test.Book 1 = 23 |
532 Billings, MT |
Scale = $29.69 |
Work is slow.Book 1 = 19 |
545 St Joseph, MO |
Scale $31.00 |
Several upcoming projects may get into Book 2 still a month or so away. Most locals working, but overall slow in jurisdiction. School project should start in Feb/March.Book 1 = 15 |
553 Raleigh, NC |
Scale $22.25 |
Local has full employment. Projects include small data center, waste water treatment plant, & other local commercial jobs.Book 1 = 10 |
558 Sheffield, AL |
Scale = $24.13 |
Steel mill outage manned up at the present time. Toyota plant scheduled to hire in the upcoming Spring / Summer.Book 1 = 100 |
570 Tucson, AZ |
Scale $23.75 |
Work has slowed down but do have some mine projects in the future which require MSHA training. Other projects ongoing include University job & water treatment plant. |
576 Alexandria, LA |
Scale = $22.65 |
Fax from home local to sign book.Book 1 = 5 |
584 Tulsa, OK |
Scale $25.03 |
Book 1 is clear. Google job expected to hire over 1000 before its completion. Refinery turn around ongoing as well as arc suppression job at powerhouse. Other work includes glass plants, Keystone pipeline work, wind farms, and several more powerhouses. MAY OBTAIN AN APPRENTICE LICENSE AT HALL IN LEIU OF STATE LICENSE TO TAKE CALL.Book 1 = 23 |
595 Dublin, CA |
Scale = $33.45 |
A few calls going into Book 2. Berkeley remodel ongoing - Powerhouse & hospital projects mostly manned up.Book 1 = 160 |
601 Champaign - Urbana, IL |
Scale $36.91 |
Work is slow throughout the area. Wind farm project should be complete soon with layoffs expected. Small nuke outage in February.Book 1 = 81 |
602 Amarillo, TX |
Scale = $24.50 |
Calls getting into Book 2 for cheese plant job. Other industrial projects expected throughout the spring into the summer months.Book 1 = 6 |
617 San Mateo, CA |
Scale = $51.00 |
Work is good for local hands. Upcoming airport project may get into Book 2Book 1 = 84 |
639 San Luis Obispo, CA |
Scale = $34.70 |
Calls for Diablo canyo outage getting into Book 2. Solar projects should continue to hire as well.Book 1 = 28 |
640 Phoenix, AZ |
Scale $25.64 |
Next phase of Intel project is ongoing. Solar plant starting to wind down, but summer looks very promising. Upcoming projects include data center, hospitals & USAA headquarters.Book 1 = 180 |
648 Hamilton, OH |
Scale = $25.50 |
No work til late summer.Book 1 = 82 |
649 Alton, IL |
Scale = $38.40 |
Work is picking up. Book 1 is clear & putting some Book 2 out over the last several weeks. Work expected to pick up at refinery sometime in June.Book 1 = 35 |
684 Modesto, CA |
Scale $34.60 |
Local hands staying busy with several jobs in the area. Amazon project ongoing & some work at winery. Solar project scheduled for the end of the year.Book 1 = 40 |
697 Gary - Hammonds, IN |
Scale = $37.70 |
Boom is coming to an end & work is slowing down with layoffs expected. Industrial summer work most likely will stay in book 1.Book 1 = 19 |
700 Fort Smith, AR |
Scale = $21.90 |
Work is slow.Book 1 = 40 |
702 West Frankfort, IL |
Scale $37.93 |
Work is slow throughout the area. Local has about 35% unemployment. Commercial project scheduled for after the first of the year.Book 1 = 137 |
704 Dubuque, IA |
Scale $28.45 |
John Deere plant at a stand still at the current time. Chemical plant starting to hire. Expect more calls over the next several weeks. School work projects coming this summer.Book 1 = 29 |
714 Minot, ND |
Scale = $28.03 - $36.08Need state license. |
Calls have been going unfilled, while most calls require a state license or apprentice license, powerhouse calls do not.Book 1 = clear |
714 Minot, ND |
Scale = $28.03 - $36.08Need state license. |
Calls have been going unfilled, while most calls require a state license or apprentice license, powerhouse calls do not.Book 1 = clear |
716 Houston, TX |
Scale = $27.65 |
Work is booming & calls going unfilled. Projects include commercial jobx, hospitals, multi-story tower building, BP administrator building, multi-story downtown remodel, 42 story high end condos, parking garage & university stadium. There is also a 350 acre EXON project that includes a parking garage, data center & power distribution center. A few calls require Texas JW license, but most can get by with purchasing Apprentice license.Book 1 = 300 |
725 Terre Haute, IN |
Scale = $34.35 |
Expected to get into Book 2 by early summer. Look for continuing work at Marathon refinery and shutdown work at Meron powerhouse. Future projects include water treatment plant, turkey plant, hospital, school/dorm work & Newton Powerhouse. Book 1 = 50 |
812 Williamsport, PA
|
Scale =$25.57 |
Calls have slowed in the area. Probably won't get into Book 2 until April or May. Upcoming work picture includes continuing work at schools & university, gas/turbine plant and work in the gas fields.Book 1 = 22 |
816 Paducah, KY |
Scale = $29.47 |
Work is slowBook 1 = 58 |
873 Kokomo, IN |
Scale $32.03 |
Work is steady for local hands & book 2 is slow. Wind farms manned up.Book 1 = 30 |
995 Baton Rouge, LA |
Scale = $22.87 |
Work is slow throughout the area. Have some projects coming, but not expected to get into book 2. Future work includes powder plant add on, IBM, Costco & hospital job scheduled before the end of the year.Book 1 = 160 |
1141 Oklahoma City, OK(405) 670-4777 |
State License required or $25 working permit availableScale=$26.40 |
Work is slow. Keystone pipeline project may hire 20 for 4-6 month duration. No work for Book 2.Book 1= 184 |
1340 Newport News, VA |
Scale $24.58 |
Work coming soon - Large industrial plant should take 30-40 electricians. NASA job should take about 30 but will require a state license. Other projects coming include a ship yard and paper mill.Book 1 = 29 |
1516 Jonesboro, AR |
Scale = $23.66Sign in by fax from home local |
Work is good in the area with a few open calls for Steel Mill project which is currently working 5-10's. Hospital job is still looking for help as well. Call local for details.Book 1 = 9 |
1579 Augusta, GA |
Scale = $25.30 |
Open Welding Calls for Vogtle Plant. Anticipate needing manpower in the next couple of months for both the Mox fuel facility and the Vogtle nuke project.Book 1 = 66 |
1701 Owensboro, KY |
Scale = $28.86 |
Hospital project has peaked in manpower. Hydro Dam project going slow. Several projects coming - Hotel & Convention Center. Look to March/April. Book 1 = 49 |
Local Union 124__301 E 103rd Terrace, Kansas City, MO 64114__(816) 942-7500
copyright 2011__lla/opeiu-320